W/ONB/NPWR-36/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks at Kruiss & August Dam 2 Village Localities in HARDAP Region |
- VSO Plus Investment
|
Download
|
G/ONB/NPWR-02/2023 |
Supply and Delivery of a 3MVA, 66/3.3kV YNd1 Power Transformer |
- Megatron Engineering (Pty) Ltd
|
Download
|
G/OIB/NPWR-06/2022 |
PROCUREMENT OF INDEPENDENT POWER PRODUCER FOR THE DEVELOPMENT OF A 50MW WIND POWER PLANT NEAR LUDERITZ ON A BUILD-OWN-OPERATE (BOO) BASIS |
- Energy China-Riminii JV China Energy International Group CO. Riminii Investments (Pty) Ltd
|
Download
|
G/ONB/NPWR-08/2023 |
Design, Manufacture, and Delivery of a Test Rig and Test Weights, and Associated Works for Ruacana Power Station Overhead Cranes |
- Infinity Engineering and Project Consultants
|
Download
|
G/ONB/NPWR-07/2023 |
Replacement of NamPower 3PAR StoreServ 8000 series systems and migration of existing data, as well as a 5-year Service Leve Agreement |
- ONIX Business Solutions (PTY) Ltd
|
Download
|
G/RB/NPWR-08/2023 |
Supply, Manufacturing, Testing and Delivery of Protection Automation and Control Equipment for stock |
- Megatron Engineering (PTY) Ltd
|
Download
|
G/ONB/NPWR-01/2023 |
DESIGN, MANUFACTURE, DELIVERY, DECOMMISSIONING, INSTALLATION, AND COMMISSIONING OF DIVERSION WIER 380 V ELECTRICAL BOARDS AT RUACANA POWER STATION |
- Dynamic Power Solutions cc
|
Download
|
G/RB/NPWR-07/2023 |
Supply, Manufacturing, Testing and Delivery of Protection Automation and Control Equipment for stock |
- Addiza Energy Solutions
|
Download
|
G/OIB/NPWR-06/2023 |
Designing, Manufacturing, Testing, Delivering, and cold Commissioning of Spare Transformers for Kombat and Okatope Substation |
- Actom Energy Namibia
|
Download
|
W/OIB/NPWR-02/2022 |
Prequalification for the Procurement of a Contractor for the Engineering, Procurement and Construction (EPC) of the NamPower 40MW Rosh Pinah Wind Plant |
- Goldwind-HydroChina Consortium
- Sany Renewable Energy Co. Ltd and China Gezhouba Group Co. Ltd Joint Venture (SANY-CGGC-JV)
- Vestas Southern Africa (Pty) Ltd
- Harbin Electric Corporation Wind Power Co. Pty and China Huadian Engineering Co. Ltd Joint Venture
- Nordex Energy South Africa (RF) (Pty) Ltd
|
Download
|
W/ONB/NPWR-12/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks in Omusati Region at Amwaama gwaShaanika, Oumaand Ondeipanda |
- Faradays Electrical and Mechanical JV MJ Engineeering
|
Download
|
W/ONB/NPWR-14/2022 |
Construction of the Medium Voltage (MV) & Low Voltage (LV) Networks in //Kharas Region at Vergenoeg |
- VSO Plus Investment Cc
|
Download
|
W/ONB/NPWR-29/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks supplying Edward JP in Ohangwena Region |
- Together Electrical Services Cc
|
Download
|
W/ONB/NPWR-28/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks supplying Otshikolongondjo Locality in Oshana Region |
- ETN Technical Services Cc
|
Download
|
W/ONB/NPWR-27/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks supplying various localities in the Ohangwena Region |
- Power Electrical and Construction Cc
|
Download
|
W/ONB/NPWR-26/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks supplying Matende locality in Kavango West Region |
- Together Electrical Services Cc
|
Download
|
W/ONB/NPWR-24/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks Ozorongondo Localities in Omaheke Region |
- Pioneers Power Installations Cc
|
Download
|
W/ONB/NPWR-22/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks supplying Goreses in Omaheke Region |
- Together Electrical Services Cc
|
Download
|
W/ONB/NPWR-16/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks supplying Swartdam locality in Hardap Region |
- VSO Plus Investment Cc
|
Download
|
SC/RP/NPWR-17/2022 |
Consultancy services for the implementation of a Corporate BI Dashboard |
- Green Enterprises
|
Download
|
SC/RP/NPWR-08/2022 |
CONSULTANCY SERVICES TO DEVELOP AN IT CYBERSECURITY STRATEGY ALIGNED TO NAMPOWER'S INTEGRATED STRATEGIC BUSINESS PLAN (ISBP) |
- Onix Business Solutions
|
Download
|
G/RB/NPWR-07/2022 |
Supply and Delivery of Steam Coal for Van Eck Power Station |
- Morupule Coal Mine
|
Download
|
G/RB/NPWR-03/2022 |
Procurement and Installation of Electricity Meter Data Management (MDM) System |
- Landis+Gyr
|
Download
|
G/ONB/NPWR-11/2022 |
Supply, Delivery, and Offloading of Medium Voltage Auxiliary Transformers |
- Megatron Engineering Namibia (Pty) Ltd
|
Download
|
G/ONB/NPWR-10/2022 |
Supply, Delivery, and Offloading of 11kV to 33kV NEC/NER/Auxiliary Transformers |
- Pupkewitz Megatech (Pty) Ltd
|
Download
|
W/RB/NPWR-05/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks in Ohangwena Region |
- Electro Hinsch Contracting (Pty) Ltd
|
Download
|
W/ONB/NPWR-37/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks at Namasira Check Point in Kavango West Region |
- Lakadiva Investment Cc
|
Download
|
W/ONB/NPWR-35/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks supplying Seringkop Settlement Farm in Kunene Region |
- NGC Investments Cc JV HBHJE Investment Cc
|
Download
|
W/ONB/NPWR-34/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks for Sava, Nandingwa, Wiwi and Hema Localities in Kavango West Region |
- Faraday’s Electrical & Mechanical Cc
|
Download
|
W/ONB/NPWR-33/2022 |
CONSTRUCTION OF MEDIUM VOLTAGE (MV) AND LOW VOLTAGE (LV) NETWORKS SUPPLYING VARIOUS LOCALITIES IN KAVANGO EAST REGION |
- NGC Investment Cc JV HBHJE Investment
|
Download
|
W/ONB/NPWR-32/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks at Oshikango Extension 1 & 7 in Ohangwena Region |
- Moupika Investment Cc
|
Download
|
W/ONB/NPWR-31/2022 |
Construction of the Medium Voltage (MV) & Low Voltage (LV) Networks in Kavango West Region at Mbore Village |
- BDI Electric and Construction Cc
|
Download
|
W/ONB/NPWR-30/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks supplying Jakkaldraai in //Karas Region |
- NAS Engineering Construction
|
Download
|
W/ONB/NPWR-18/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks supplying Shaghaya locality in Kavango East Region |
- Johvic Trading Enterpries JV J & A electric and Civil Construction cc
|
Download
|
W/ONB/NPWR-17/2022 |
Construction of Medium Voltage and Low Voltage Networks Supplying Mungomba and Karanawa localities in Kavango West Region |
- ETN Technical Services
|
Download
|
W/ONB/NPWR-11/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks in Hardap Region |
- Multi Solutions cc
|
Download
|
W/ONB/NPWR-05/2023 |
Construction of Omburu Substation Extension - Platform, Foundations, Road, and Support Structures |
- Shivute Construction CC
|
Download
|
G/ONB/NPWR-05/2023 |
Supply and Delivery of Vehicles and Equipment to NamPower |
- Pupkewitz Motors: Lot 1, 2, 3, 4,5 and 6.
- Bezer’s Trailer Body Craft CC: Lot 7 & 8.
- Hydraulic Repairs CC: Lot 9.
- Namibia Lift and Shift Crane Service CC: Lot 10
|
Download
|
G/ONB/NPWR-03/2023 |
Supply and Delivery of Overhead Power Lines Materials and Hardwares for a Three (3) Year Period |
- Power Line Africa - Lot 1, 2, 3, 4 & 5
- MJ Engineering cc - Lot 2 & 3
- Transparent Investment cc - Lot 1, 2, 3, 4 & 5
- Lakadiva Investment cc - Lot 1, 2, 3 & 4
- NGC Investment cc - Lot 1, 2, 3, 4 & 5
- AKM Engineering cc - Lot 1, 2, 3, 4 & 5
- Habasen Trading cc - Lot 1, 2, 3, 4 & 5
- Namibian Freshness (Pty) Ltd - Lot 1 & 2
- FI Trading Enterprises cc - Lot 1, 4 & 5
|
Download
|
G/OIB/NPWR-04/2023 |
Supply and Delivery of Optical Fibre Ground Wire (OPGW) |
- Apar Industries Limited
|
Download
|
G/OIB/NPWR-10/2022 |
Supply and Delivery of ACSR Tern Conductor |
- Apar Industries Limited
|
Download
|
W/ONB/NPWR-03/2023 |
Supply, Delivery, Installation, Testing and Commissioning of the Electronic Security Systems at Lithops, Namib and Katima Mulilo Substations |
- CSS Tactical Solutions Namibia cc
|
Download
|
G/RB/NPWR-03/2023 |
Supply and Delivery of Vehicles and Equipment to NamPower |
- Barloworld Equipment
|
Download
|
G/RB/NPWR-11/2022 |
Supply and Delivery of Heavy Vehicles to NamPower |
- M & Z Commercial Vehicles for N$11,778,808.83 - Lot 1 and 2.
|
Download
|
G/OIB/NPWR-03/2023 |
Supply and Delivery of Composite Insulators for Kuiseb-Sekelduin 132kV Transmission Lines |
- Vexila Electrical Technology (PTY) LTD
|
Download
|
G/OIB/NPWR-02/2023 |
Supply and Delivery of Hardware and Damping Study for Kuiseb-Sekelduin 132kV Transmission Lines |
- McWade Powerlines
|
Download
|
G/OIB/NPWR-01/2023 |
Supply and Delivery of Flicker Conductor for Kuiseb-Sekelduin 132kV Tx Lines |
- Apar Industries Limited
|
Download
|
G/RB/NPWR-01/2023 |
Transport of Steam Coal for Three (3) Years |
- Morupule Coal Mine (Pty) Ltd
- Minergy Coal (Pty) Ltd
|
Download
|
NCS/ONB/NPWR-01/2023 |
Provision of Local Courier and Related Services to NamPower for a Three (3) Year Period |
- Namibia Post Limited
|
Download
|
NCS/RB/NPWR-02/2023 |
Provision of Fuel Payment Solution to NamPower For a Three (3) Year Period |
- Standard Bank of Namibia
|
Download
|
SC/RP/NPWR-18/2022 |
Provision Of Occupational Medical Health Services for A Three (3) Year Period |
- City Medical Centre cc
|
Download
|
G/OIB/NPWR-05/2022 |
Designing, Manufacturing, Testing, Delivering, Installing and Commissioning of Power Transformers for Sekelduin Substation |
- Hyosung Heavy Industries
|
Download
|
G/OIB/NPWR-07/2022 |
Designing, Manufacturing, Testing, Delivering, Installing and Commissioning of Power Transformers |
- Hyosung Heavy Industries Corporation
|
Download
|
W/ONB/NPWR-20/2022 |
Extension of parking shed for mobile substations (Brakwater) |
- Ekodhi Investment CC
|
Download
|
W/ONB/NPWR-23/2022 |
Alteration and additions to existing NamPower Office Building at the Otjiwarongo Depot |
- Up-Mark Investments CC
|
Download
|
SC/RP/NPWR-14/2022 |
Review of the NamPower Conditions of Employment and Organisational Structure |
- Deloitte & Touché
|
Download
|
SC/RP/NPWR-21/2022 |
Provision of Consultancy Services for the Transmission Master Plan of NamPower |
- Zutari (Pty) Ltd
|
Download
|
G/ONB/NPWR-02/2022 |
Supply and Delivery of Low Voltage cables and Bare conductor to NamPower for a three (3) year period |
- AKM Engineering cc
- NGC Investment cc
- NBT Quality Services cc
|
Download
|
W/ONB/NPWR-15/2022 |
Pre-Qualification of The Contractors for The Construction of Medium Voltage (Mv) And Low Voltage (Lv) Networks in Namibia For a Period Of Three (3) Years |
- MJ Engineering
- Power Electrical and Construction ss
- Walters Electrical Services cc
- Electro Hinsch Contracting Pty Ltd
- BDI Electric and Construction cc
- Together Electrical Services
- Faraday’s Electrical and Mechanical
- Multi Solutions cc
- Fairground Investments cc
- Moupika Investments cc
- NGC Investments cc
- NBT Quality Services cc
- FI Trading Enterprises cc
- Karoo Construction cc
- Clydon Namibia cc
- Pawa Engineering cc
- Mopane Trading cc
- Forever Electrical and Construction cc
|
Download
|
G/ONB/NPWR-03/2022 |
Supply and Delivery of Various Distribution Transformers to NamPower for a three (3) year period |
- A&P Engineering Supplies and Services
- SASH TRADING & EARTHWORKS CC
- Addiza Power Consult Trust
- SASH TRADING & EARTHWORKS CC
- AKM Engineering
- SASH TRADING & EARTHWORKS CC
- Dynamic Power Solutions Namibia cc
- SASH TRADING & EARTHWORKS CC
- Faradays Investments cc
- SASH TRADING & EARTHWORKS CC
- NGC Investment cc
- SASH TRADING & EARTHWORKS CC
- Protecton Engineering Namibia cc
- SASH TRADING & EARTHWORKS CC
|
Download
|
NCS/ONB/NPWR-03/2022 |
Prequalification of Preferred Suppliers For The Transport of Steam Coal For Three (3) Years |
- NEKDILO LOGISTICS & INVESTMENT CC JV NDJAMO LOGISTICS CC
- SASH TRADING & EARTHWORKS CC
- COLEMAN TRANSPORT (PTY) LTD JV INNOX LOGISTICS CC
|
Download
|
NCS/ONB/NPWR-02/2022 |
Provision of Cleaning Services For NamPower Buildings In Windhoek And Brakwater For a Three (3) Year Period |
- ROHA INVESTMENTS
|
Download
|
SC/RP/NPWR-10/2022 |
Provision of Safety, Health and Environmental (SHE) Services and Support to Generation (Gx) Capital Projects for Four (4) Years) |
- SHEQ EYEQ Consultancy cc
|
Download
|
SC/RP/NPWR-16/2022 |
Provision of Short-Term Insurance Management Services (Brokerage) for NamPower for a three (3) year period |
- Minet Namibia Insurance Brokers (Pty) Ltd
|
Download
|
NCS/RB/NPWR-03/2021 |
Provision of Alarm Monitoring & Response Services at Various NamPower Sites |
- G4S
|
Download
|
W/RB/NPWR-03/2022 |
Designing, Manufacturing, Testing, Delivering, Installing and Commissioning of 160MVA, 400/66/22kV YNyn0d1 Power Transformer for Obib Substation |
- Hyosung Heavy Industries Corporation
|
Download
|
G/ONB/NPWR-08/2022 |
Supply and delivery of Heavy Vehicles and Equipment to NamPower |
- Forklift & Allied Equipment CC: Lot 1.
- Autohaus Windhoek (PTY) LTD: Lot 2 and 8.
- Hydraulic Repairs CC: Lot 4,6 and 7.
|
Download
|
G/ONB/NPWR-09/2022 |
Supply and Delivery of Various Vehicles to NamPower |
- Pupkewitz Toyota a Division of Pupkewitz Motors (PTY) LTD Lot 1, 2, 3, 4, 5 and 6.
|
Download
|
G/RB/NPWR-04/2022 |
Supply and Delivery of Wall Bushings for the Sekelduin Substation Building Project |
- Continental Africa Power Supplies (PTY) Ltd
|
Download
|
SC/RP/NPWR-03/2022 |
Provision of Environmental Impact Assessment for the Proposed Erongo Substation and Associated Infrastructure |
- D&P Engineers and Environmental Consultants
|
Download
|
W/ONB/NPWR-09/2022 |
Construction of Ohama Substation: Civil, Steel, Road and Building Works (Phase 2). |
- Shivute Construction CC
|
Download
|
W/ONB/NPWR-21/2022 |
Proposed Alterations and Renovations at NamPower Transmission Engineering Centre (NPTEC) Building. |
- Penatu Trading JV. PMPH & Construction CC
|
Download
|
W/ONB/NPWR-10/2022 |
Replacement of Roof Sheets at Tamarisk Substation |
- Walcon Constriction CC
|
Download
|
G/ONB/NPWR-29/2021 |
Supply and delivery of Oils and Lubricants to NamPower for a Period of 3 years |
- Benguela Petroleum Supplies CC
- Alpha Petroleum (Pty) Ltd
- NGC Investment CC
- Promax Investment CC
|
Download
|
NCS/RB/NPWR-04/2022 |
Provision of Actuarial Services for Three Years |
- ZAQ Consultants & Actuaries Namibia (Pty) Ltd (ZAQ)
|
Download
|
G/ONB/NPWR-04/2022 |
Pre-Qualification of Suppliers for the Design, Manufacturing, Testing, Supply and Delivery of Protection Automation and Control Equipment for Stock For a Three (3) Year Period |
- Megatron Engineering Namibia (Pty) Ltd
- Protecton Engineering Namibia (Pty) Ltd
- Addiza Power Consultants
|
Download
|
G/OIB/NPWR-04/2022 |
Pre-Qualification of Suppliers for the Design, Manufacturing, Testing, Supply and Delivery of Protection Automation and Control Equipment for Stock For a Three (3) Year Period |
- Actom Energy Namibia (Pty) Ltd LOT 1 & LOT 2
- Protecton Engineering Namibia (Pty) Ltd LOT 1
- DLO Energy Solutions (Pty) Ltd LOT 1 & LOT 2
- Addiza Energy Solutions (Pty) Ltd LOT 1 & LOT 2
|
Download
|
W/ONB/NPWR-13/2022 |
Construction of the Medium Voltage (MV) & Low Voltage (LV) Networks in Omusati Region at Eengwena, Elao and Onehahi |
- Multi Solutions cc
|
Download
|
W/RB/NPWR-04/2022 |
Procurement of Geotechnical, Hydrological/Hydrogeological Works, and Related Surveys at a Site in Rosh Pinah for the Development of the 40MW Rosh Pinah Wind Project |
- Knight Piesold Consulting (Pty) Ltd
|
Download
|
W/ONB/NPWR-19/2022 |
Construction of the Medium Voltage (MV) & Low Voltage (LV) Networks supplying Liswani, Lyanshulu and Kasibi localities in Zambezi Region |
- BDI Electric and Construction Cc
|
Download
|
W/ONB/NPWR-01/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks in Kunene Region |
- NBT Quality Services
|
Download
|
G/ONB/NPWR-23/2021 |
SUPPLY & DELIVERY OF STATIONERY TO NAMPOWER FOR THREE (3) YEARS |
- New Success Investment cc
- Nghilifenanye Investment cc
- Faradys Investment cc
- Nangu Line Trading
- RW Investment cc
- Essential Investments
- Habassen Trading
- Bonga Trading cc
- Globemaster Trading
- KK Target Trading
- Prime Innovative Tech
- Rendez Vous
|
Download
|
G/ONB/NPWR-21/2021 |
SUPPLY, INSTALLATION AND MAINTENANCE OF VEHICLE TRACKING DEVICES TO NAMPOWER FOR FIVE (5) YEARS |
- KICT (PTY) LTD
|
Download
|
W/ONB/NPWR-06/2022 |
Construction of Kuiseb Substation Enclosure |
- Walcon Construction CC
|
Download
|
W/ONB/NPWR-08/2022 |
Additions and Alterations to the Existing Office Block at Tamarisk Transmission Station for NamPower |
- NBT Quality Services
|
Download
|
W/RB/NPWR-01/2022 |
Procurement of a Contractor for Designing, Manufacturing, Installing and Commissioning of 50MVAr, 400kV Air-Core Reactors at Gerus Substation |
- Trench Austria GmbH
|
Download
|
W/OIB/NPWR-02/2021 |
Engineering, Procurement and Construction (EPC) of the Omburu Battery Energy Storage System (BESS) |
- Siemens Energy Global GmbH & Co. KG
- Alpha Namibia Industries Renewable Power Limited and The Frans Indongo Investment Trust Joint Venture
- Sinohydro Corporation Limited
- OLC Solar Energy Corporation (PTY) Ltd
- China Gezhouba Group Company Limited and Shenzen Cube Energy Co., Ltd
- Shanghai Electric Group Co., Ltd
- Sumec Complete Equipment & Engineering Co., Ltd
- Pinggao Group Co., Ltd
- Elsewedy Electric for Transmission & Distribution
- Larson and Toubro Limited
- Shandong Electrical, Engineering & Equipment Group Co., Ltd (SDEE) and Zhejian Narada Power Source Co., Ltd Joint Venture
- Zonergy (Tianjin) Company Limited and Kehua Data Co., Ltd
|
Download
|
W/OIB/NPWR-03/2021 |
Procurement of a Contractor for the Engineering, Procurement and Construction (EPC) of the Anixas II Power Station |
- F.K. Generator and Equipment Ltd. JV with August Twenty Six Construction JV with PHIM Investments CC
|
Download
|
SC/RP/NPWR-01/2022 |
Consultancy Services of Transaction Advisor for the CSP Project, PPP Project |
- Fichtner GmbH & Co. KG.
|
Download
|
W/ONB/NPWR-02/2022 |
Construction of Medium Voltage (MV) and Low Voltage (LV) Networks in Ohangwena Region |
- Multi Solutions cc
|
Download
|
W/ONB/NPWR-03/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks in //Kharas Region |
- NBT Quality Services
|
Download
|
W/ONB/NPWR-04/2022 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks in Oshikoto Region |
- Multi Solutions cc
|
Download
|
W/ONB/NPWR-05/2022 |
Construction of Medium Voltage (MV) and Low Voltage (LV) Networks in Omaheke Region |
- Power Electrical & Construction Cc
|
Download
|
G/ONB/NPWR-05/2022 |
Supply, Delivery, and Offloading of Various HV and MV Surge Arrestors |
- Megatron Engineering Namibia (Pty) Ltd -(132kV, 66kV, 33kV and 22kV)
- Addiza Power Consultants (220kV-without Surge counters and 220kV (with Surge counters
|
Download
|
W/RB/NPWR-04/2021 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks in Zambezi Region |
- BDI Electric and Construction cc
|
Download
|
W/ONB/NPWR-17/2021 |
Construction of the Medium Voltage and Low Voltage Networks for Mukekete, Mpotomutalala, Nairenge, Suni, Katjinakatji and Kandumbu Localities in Kavango West Region |
- Power Electrical and Construction Cc
|
Download
|
G/ONB/NPWR-19/2021 |
Design, Manufacture, Supply and Delivery, Install, Test and Commission of Two Outdoor Compact Substations, Two Protection Schemes, 3 Phase 22kV Cable for Substation Interconnection |
- Megatron Engineering Namibia (Pty) Ltd
|
Download
|
G/RB/NPWR–10/2021 |
Supply, Delivery, and Offloading of Various MV & HV Current Transformers |
- Siemens/Trench Germany GmbH (Lot 1 & Lot 2)
- Actom Energy Namibia (Lot 3)
|
Download
|
W/ONB/NPWR-14/2021 |
Construction of Shiyambi Substation - Civil, Road and Building Works |
- Radial Truss, Deka Consulting & NGC Consortium
|
Download
|
NCS/RB/NPWR-05/2021 |
Revaluation, impairment & desktop review of NamPower’s core assets for a period of 3 years |
- MPAMOT Africa (Pty) Ltd
|
Download
|
SC/EOI/NPWR-02/2021 |
Expression of Interest for the Replacing and Maintenance of NamPower’s Access Control System |
- CSS Tactical Solutions Namibia
|
Download
|
G/RB/NPWR-07/2021 |
Design, Manufacturing, Testing, Supply and Delivery of Protection Automation and Control Equipment for The 330kv Omburu Feeder and 330kv Ruacana Feeder |
- Megatron Engineering Namibia
|
Download
|
W/RB/NPWR-03/2021 |
Design, Supply, Delivery, Installation, Splicing, Testing and Commissioning of Optic Fibre Networks Between Van Eck Substation and NamPower Head Office Building |
- Fiber Communications Namibia CC
|
Download
|
W/ONB/NPWR-20/2021 |
Construction of Switchgear Control Building for Rundu Substation |
- Capital Technical Services CC
|
Download
|
W/ONB/NPWR-10/2021 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks De Riet Locality in Kunene Region |
- Johvic Trading Enterprises JV J&A Electric and Civil Construction CC
|
Download
|
G/RB/NPWR-08/2021 |
Supply and delivery of Construction Vehicles to NamPower |
- Barloworld Namibia (Pty) Ltd T/A Barloworld Equipment: Lot 1 and 2
|
Download
|
G/ONB/NPWR-18/2021 |
Supply and delivery of Various Vehicles to NamPower |
- Indongo Toyota: Lot 1, 2, 3, 4, 6 and 7
- Bezers Trailer Body Crafts: Lot 8, 9, 10, 11, 12, 13, 14, 15 and 16
|
Download
|
G/RB/NPWR-09/2021 |
Designing, Manufacturing, Testing, Delivering, Installing and Commissioning of Withdrawable AC Metal-Clad Switchgear |
- Actom Energy Namibia (PTY) Ltd
|
Download
|
G/OIB/NPWR-05/2021 |
Design, Manufacturing, Testing and Delivery of a 61 MVA, 220/6.65 kV YNd5 Power Transformer |
- Hyosung Heavy Industries Corporation
|
Download
|
W/OIB/NPWR-01/2021 |
Procurement of a Contractor for Designing, Manufacturing, Installing and Commissioning of 100MVAr, 400kV Air-Core Reactor at Auas Substation |
- Trench Austria GmbH
|
Download
|
G/ONB/NPWR-04/2021 |
Supply, Delivery and Offloading of 220kV High Voltage Circuit Breakers |
- Megatron Engineering Namibia (Pty) Ltd (ITEM 1 & 2)
|
Download
|
W/RB/NPWR-02/2021 |
Technical Works to Conduct Geotechnical and Hydrological-Hydrogeological Surveys at a Site in Lüderitz Earmarked for the Development of Two (2) Wind Power Plants |
- Burmeister and Partners (Pty) Ltd
|
Download
|
W/ONB/NPWR-15/2021 |
Construction of the Medium Voltage (MV) & Low Voltage (LV) Networks in \\Kharas Region at Vaalgras & Enoch Villages |
- Power Electrical and Construction Cc
|
Download
|
G/ONB/NPWR-15/2021 |
Supply and Delivery of 1x5MVA 66/33kV Dyn11 Power Transformers |
- Megatron Engineering Namibia (Pty) Ltd
|
Download
|
W/ONB/NPWR-14/2021 |
Construction of the Medium Voltage (MV) and Low Voltage (LV) Networks Supplying Ehangano, Ohahati and Oshikondailwa Localities in Oshikoto Region |
- Multi Solutions Cc
|
Download
|
G/ONB/NPWR-09/2021 |
Supply, Delivery and Offloading of 33kV to 220kV Isolators / Disconnectors. |
- Megatron Engineering Namibia (Pty) Ltd
|
Download
|
G/ONB/NPWR-05/2021 |
Supply, delivery and offloading of 33kV and 132kV Circuit Breakers |
- Protecton Engineering Namibia CC (Item 1 & 3)
- Dynamic Power Solution Namibia CC (Item 5)
|
Download
|
G/RB/NPWR-04/2021 |
Supply and delivery of 400kV Circuit Breakers for Auas and Gerus Substations |
- ABB Power Grid South Africa (Pty) Ltd
|
Download
|
G/ONB/NPWR-02/2021 |
Supply, delivery and offloading of Various HV and MV Current Transformers |
- Addiza Power Consultants (Item 3,4 and 5)
|
Download
|
W/ONB/NPWR-01/2021 |
Construction of an Ablution Block for Artisans and Operators at Van Eck Power Station, Windhoek |
- Kavaikwa Trading cc
|
Download
|
G/ONB/NPWR-01/2021 |
Supply, Delivery and offloading of various HV and MV Voltage Transformers and Capacitive Voltage Transformers |
- Megatron Engineering Namibia (Pty) Ltd (Item 1-6)
|
Download
|
G/ONB/NPWR – 23/2020 |
Supply and Delivery of various Power Transformers |
- Pupkewitz Megatech (Pty) Ltd: Lot1
- Megatron Engineering Lot 2
- Megatron Engineering: Lot3
|
Download
|
W/ONB/NPWR – 45/2020 |
Construction of Medium Voltage (MV) and Low Voltage (LV) Networks in Zambezi Region at Mahundu Village |
- BDI Electrical & Construction cc
|
Download
|
W/ONB/NPWR-15/2021 |
Procurement of Civil Works and Mechanical and Electrical Erections for Gerus Substation 400kV Auas Feeder Bay Extensions |
- Adenco Construction Namibia JV CSV Construction Namibia (PTY) Ltd
|
Download
|
W/ONB/NPWR-13/2021 |
Construction of Masivi Substation - Civil, Road, Building and Steel Works |
- Radial Truss, Deka Consulting & NGC Consortium
|
Download
|
W/ONB/NPWR-09/2021 |
Procurement of Civil Works and Mechanical and Electrical Erections for Auas Substation 400kV Feeder Bay Extensions |
- Adenco Construction Namibia JV CSV Construction Namibia (PTY) Ltd
|
Download
|
G/ONB/NPWR-12/2021 |
Supply, Delivery and Offloading of Various Substation Batteries with the Support Stands for a Three (3) year period |
- Addiza Power Consultants
- Protecton Engineering Namibia
- Gongaleni Investment cc
|
Download
|
G/ONB/NPWR-10/2021 |
Supply and Delivery of Branded Personal Protective Equipment to NamPower for a three (3) year period |
- Baleia Do Mar Industrial Safety Suppliers for lot A, B C, and D
- DDP Agencies cc for lot A, B and C
- Faradays Investments cc for lot B and D
|
Download
|
G/ONB/NPWR-07/2021 |
Supply and Delivery of Branded Promotional Items to NamPower for a three (3) year period |
- Hansen & Hansen Investment
- Signarama Designs Windhoek
|
Download
|
NCS/ONB/NPWR-13/2020 |
Collection and purchasing of various waste products from various NamPower sites for a Three (3) year period |
- Phements Trading cc
|
Download
|
SC/RP/NPWR-05/2021 |
Provision of Vegetation Impact Studies for the Otjikoto-Masivi 220kV Transmission Line |
- KPM Trading CC T/A KPM Environmental Consulting
|
Download
|
SC/RP/NPWR-04/2021 |
Provision of Bird Impact Studies for the Otjikoto-Masivi 220kV Transmission Line |
- KPM Trading CC T/A KPM Environmental Consulting
|
Download
|
SC/RP/NPWR-03/2021 |
Provision of Socio-Economic Impact Assessment Study for the Otjikoto-Masivi 220kV Transmission Line |
- Human Resources and Disaster Consultants CC
|
Download
|
SC/RP/NPWR-02/2021 |
Provision of Archaeological Studies for the Otjikoto-Masivi 220kV Transmission Line |
- KPM Trading T/A KPM Trading Environmental Consulting CC
|
Download
|
W/RB/NPWR-02/2020 |
Designing, Manufacturing, Testing, Delivering, Installing and Commissioning of 120MVA, 400/66/22kV YNyn0d1 Power Transformer for Obib Substation |
- SGB SMIT POWER MATLA (PTY) Ltd
|
Download
|
NCS/RB/NPWR-01/2021 |
Provision of Microsoft Agreement to NamPower for a three (3) year period |
- Business Connexion Namibia (BCX)
|
Download
|
NCS/ONB/NPWR-11/2020 |
Provision of Auctioneering Services to NamPower for a three (3) year period |
- Fix Eagle Investments cc t/a Fix Eagle Investment Auctioneers cc
|
Download
|
W/ONB/NPWR-31/2020 |
Construction of Medium Voltage and Low Voltage Networks at Doorn Daberas in //Kharas Region. |
- NBT Quality Services CC
|
Download
|
W/ONB/NPWR-32/2020 |
Construction of Medium Voltage and Low Voltage Networks at Ibbu, Malundu and Kayuwo Villages in Zambezi Region. |
- NGC Investment CC
|
Download
|
W/ONB/NPWR-47/2020 |
Construction of The Medium Voltage (MV) And Low Voltage (LV) Networks at Ncude & Ncumushi villages in Kavango East Region |
- Together Electrical Services CC
|
Download
|
NCS/RB/NPWR-02/2021 |
Provision of Microsoft Agreement (Servers Licenses) to NamPower for a three (3) year period |
- Business Connexion Namibia (BCX)
|
Download
|
NCS/ONB/NPWR-14/2020 |
Provision of Local Travel Management Services |
- Seasons Travel & Tours Namibia
|
Download
|
SC/RP/NPWR-17/2020 |
Provision of Advertising and Related Services to NamPower for a three (3) year period |
- TBWA/Paragon
|
Download
|
G/ONB/NPWR-22/2020 |
Supply and Delivery of Heavy Vehicles to NamPower |
- M&Z Group Limited [Lot no.: 1]
- M&Z Group Limited [Lot no.: 2]
|
Download
|
G/ONB/NPWR-21/2020 |
Supply and Delivery of Construction Vehicles to NamPower |
- M&Z Group Limited [Lot no.: 1]
- Carmix Hire and Sales [Lot no.: 2]
|
Download
|
W/RB/NPWR-03/2020 |
Live Line Maintenance of 400kV Transmission Lines |
- Elektra Power
|
Download
|
W/ONB/NPWR-44/2020 |
Construction of the Khurub-Aussenkehr 132k Transmission Line |
- Power Line Africa
|
Download
|
W/ONB/NPWR-39/2020 |
Construction of an Access Road for NamPower at the Okatope transmission station |
- Penatu Trading CCJV PMPH & Construction CC
|
Download
|
W/ONB/NPWR-37/2020 |
Construction of a platform for Ohama Substation and access roads |
- Emirates Trading CC
|
Download
|
SC/RP/NPWR-16/2020 |
Expression of Interest for the Provision of Professional Services to NamPower for a three (3) year period |
Prequalified Architectural Service Providers
- Andrew Main Architects
- Barnard Mutua Architects
- Kondjeni Nkandi Architects
- Pieter Mostert Architect
- Toivo Nuugulu Architects
Prequalified Consulting Engineering Service Providers. Civil & Structural
- Bicon Namibia
- Burmeister & Partners
- CEPM
- Dunamis Consulting Engineers
- Ekwafo Consulting Engineers
- Element Consulting Engineers
- Engco Consulting Engineers
- Knight Piesold Consulting
- Lithon Project Consulting
- Lund Consulting Engineers
- Om'Kumoh
- PHIM Consulting Engineers
- Tulipamwe Consulting Engineers
- Windhoek Consulting Engineers
- WML Consulting Engineers
- Seelenbinder Consulting Engineers
Mechanical
- Bicon Namibia
- CEPM
- D & P Consulting Engineers
- Ekwafo Consulting Engineers
- Element Consulting Engineers
- Emcon
- GSFA
- Knight Piesold Consulting
- Lithon Project Consulting
- Lund Consulting Engineers
- Om'Kumoh
- PHIM Consulting Engineers
- Tulipamwe Consulting Engineers
- Windhoek Consulting Engineers
- WML Consulting Engineers
- Seelenbinder Consulting Engineers
- Engco Consulting Engineers
Electrical
- Bicon Namibia
- Burmeister & Partners
- CEPM
- Dunamis Consulting Engineers
- Element Consulting Engineers
- Emcon
- GSFA
- Knight Piesold Consulting
- Lithon Project Consulting
- Lund Consulting Engineers
- Om'Kumoh
- PHIM Consulting Engineers
- Power Consult CC
- Shashi Consulting Engineers
- Tulipamwe Consulting Engineers
- Windhoek Consulting Engineers
- WML Consulting Engineers
- Seelenbinder Consulting Engineers
- Engco Consulting Engineers
Prequalified Quantity Surveying Service Providers
- Derek Rover QS
- Hendrik Herselman QS
- Louis Burger QS
- Phillip Main QS
- Shivute & Associates QS
- Steenkamp QS
- JLQS
|
Download
|
NCS/ONB/NPWR-08/2020 |
Provision of Maintenance & Servicing of Firefighting Equipment at various NamPower sites for a three (3) year period |
- Llewellyn Suppliers cc
|
Download
|
W/ONB/NPWR-43/2020 |
Van Eck - Omburu 220kV Transmission Line Foundation Link Refurbishment |
- Clydon Namibia
|
Download
|
G/OIB/NPWR-05/2019 |
Procurement of Independent Power Producer for the Development of a 20 MW Solar Photovoltaic (PV) Power Plant at Khan Substation On A Build-Own-Operate (BOO) Basis |
- Access Aussenkjer Namibia IPP Consortium
|
Download
|
G/OIB/NPWR-04/2020 |
Supply and Delivery of ACSR Pelican Conductor |
- APAR Industries Ltd
|
Download
|
SC/RP/NPWR-05/2020 |
Procurement of Legal Advisory Services pertaining to the Otjikoto Biomass Power Station |
- ENSafrica (South Africa)
|
Download
|
W/ONB/NPWR-12/2020 |
Construction of Medium Voltage (MV) and Low Voltage (LV) Networks for Mpengu School in Kavango West Region |
- Cuvelai Electric CC
|
Download
|
W/ONB/NPWR-18/2020 |
Construction of MV and LV Networks Supplying Oshitha Shoonyushi, Eheke, Onakamwandi and Omahenene Localities in Oshana Region |
- Cuvelai Electric CC
|
Download
|
W/ONB/NPWR-27/2020 |
Construction of NamPower Staff House in Aranos |
- Elden Trading Enterprises
|
Download
|
NCS/ONB/NPWR-10/2020 |
Provision of Security Services (Guarding) to NamPower Properties for a three (3) year period |
Northern Region
- Omatando T/Station:
Omatungo Security Services cc
- Ruacana Eha Lodge:
Omatungo Security Services cc
- Ruacana Power Station:
Omatungo Security Services cc
- Otjongava Substation:
Omle Security Services cc
- Otjikoto T/Station:
Omle Security Services cc
- Zambezi T/Station:
Shimwe Trading Enterprises cc
Central North Region
- Gerus T/Station:
Bertha Security Services cc
- Otjiwarongo Depot:
Bertha Security Services cc
- Karibib Substation:
Bertha Security Services cc
- Anixas/Paratus P/Stations:
Bertha Security Services cc
- Kuiseb T/Station:
Bertha Security Services cc
- Omburu T/Station:
Shimwe Trading Enterprises cc
Central Region
- All Sites:
PIS Security Services cc
Southern Region
- All Sites:
Shine Technologies Solution (Pty) Ltd
|
Download
|
NCS/RB/NPWR-02/2020 |
Provision of External Audit Services for a period of three (3) Years |
- PriceWaterhouseCoopers (PwC)
|
Download
|
W/ONB/NPWR-23/2020 |
Construction of Medium Voltage and Low Voltage Networks Supplying Shamukweni Locality in Ohangwena Region |
- Cuvelai Electrical cc
|
Download
|
G/ONB/NPWR-18/2020 |
Supply and Delivery of Personal Computers and Peripherals to NamPower for a three (3) year period |
- Syntex Technologies (Pty) Ltd
- Green Enterprise Solutions
|
Download
|
G/ONB/NPWR-14/2020 |
Supply and Delivery of Branded Promotional Items to NamPower for a three (3) year period |
- I-Gift & Pro-safe Clothing cc
|
Download
|
W/ONB/NPWR-04/2020 |
Construction of Medium Voltage and Low Voltage Networks Supplying Onalusheshete Locality in Oshikoto Region |
- Together Electrical Services cc
|
Download
|
G/ONB/NPWR-07/2020 |
Supply and Delivery of Fleet Construction Equipment to NamPower |
- Barloworld Equipment (PTY) Ltd
|
Download
|
G/ONB/NPWR-08/2020 |
Supply and Delivery of variuos Vehicles to NamPower |
- Pupkewitz Motors
[Lot nos.: 3 , 4 –, 5 and 6]
- Indongo Auto
[Lot no.: 7]
|
Download
|
G/ONB/NPWR-16/2020 |
Retrofitting of 11kV Circuit Breakers, protection and control scheme of Station Boards 1 & 2, and to Design, Manufacture, Supply, Deliver, Install and Commission the 3.3kV Motor Control Switchgear at Ruacana Hydro Power Station |
- Megatron Engineering Namibia
|
Download
|
G/ONB/NPWR-17/2020 |
Supply and Delivery of Mini and Mid Buses to NamPower |
- Indongo Toyota
|
Download
|
W/ONB/NPWR-06/2020 |
Construction of Medium (MV) and Low Voltage (LV) Networks Dove Locality in Kavango East Region |
- Multi Solutions CC
|
Download
|
W/ONB/NPWR-17/2020 |
Construction Of Medium (MV) and Low Voltage (LV) Networks for Shimayembe in Kavango East Region |
- Multi Solution CC
|
Download
|
W/ONB/NPWR-08/2020 |
Construction of Medium (MV) and Low Voltage (LV) Networks for Kapuka School in Kavango East Region |
- Multi Solutions CC
|
Download
|
W/ONB/NPWR-09/2020 |
Construction of Medium (MV) and Low Voltage (LV) Networks for Shanodho and Sandangho School in Kavango East Region |
- Power Electrical and Construction CC
|
Download
|
W/ONB/NPWR-10/2020 |
Construction Of Medium (MV) and Low Voltage (LV) Networks for Kasara School in Kavango West Region |
- Multi Solutions CC
|
Download
|
W/ONB/NPWR-11/2020 |
Construction of Medium (MV) and Low Voltage (LV) Networks for Kaparara School in Kavango West Region |
- Power Electrical & Construction CC
|
Download
|
W/ONB/NPWR-16/2020 |
Construction of Medium (MV) and Low Voltage (LV) Networks for Okovasiona & Otjekua in Kunene Region |
- Moupika Investment CC
|
Download
|
W/ONB/NPWR-19/2020 |
Construction of Medium (MV) and Low Voltage (LV) Networks for Zilitene and Siseme in Zambezi Region |
- NBT Quality Services CC
|
Download
|
W/ONB/NPWR-21/2020 |
Construction of Medium Voltage and Low Voltage Networks at Panduleni and Taadiya in Omusati Region |
- Cuvelai Electrical cc
|
Download
|
W/ONB/NPWR-22/2020 |
Construction Of Medium (MV) and Low Voltage (LV) Networks for Kaukurus School in Omaheke Region |
- Multi Solution CC
|
Download
|
W/ONB/NPWR-24/2019 |
Construction of a new office block, extension of boundary wall and parking facilities, NamPower Keetmanshoop Office |
- Neu Olulya Trading CC
|
Download
|
NCS/ONB/NPWR-05/2020 |
Provision of International Travel Management Services to NamPower for a three (3) year period |
- Trip (Pty) Ltd
|
Download
|
NCS/ONB/NPWR-21/2019 |
The Provision of Online (Web based) Prepaid Electricity Vending System for NamPower for Five (5) years |
- Netvend Metering Solutions cc
|
Download
|
G/ONB/NPWR-12/2020 |
Supply and Delivery of Tyres and Related Services to NamPower for a three (3) year period |
- Wangara Motors Spares cc
- TyrePro (Nam) Pty Ltd t/a Tyres 2000/BTS Windhoek
|
Download
|
SC/RP/NPWR-17/2019 |
Consultancy Services for Technical Advisory and Project Management Services for the Firm Power Project |
- OST ENERGY AFRICA (PTY) LTD T/A RINA CONSULTING
|
Download
|
G/OIB/NPWR-02/2019 |
Designing, Manufacturing, Testing, Delivering, Installing and Commissioning of 66/22kV 10MVA Power Transformer |
- SGB-Smit Power Matla (Pty) Ltd
|
Download
|
W/ONB/NPWR-05/2020 |
Construction of Medium Voltage and Low Voltage Networks Supplying Omeyantalala locality in Oshikoto Region |
- Faradays Electrical & Mechanical cc
|
Download
|
SC/RP/NPWR-06/2020 |
Consultancy Services for the Feasibility, Design and Investment Preparation for the NamPower Battery Energy Storage System (BESS) |
- Fichtner
|
Download
|
G/OIB/NPWR-01/2020 |
Designing, Manufacturing, Testing, Delivering, Installing and Commissioning of a Static Frequency Converter(SFC)/Load Commutated Inverter (LCI) for Generator Run Up in Synchronous Condenser Mode |
- ABB South Africa (Pty) Ltd
|
Download
|
G/ONB/NPWR-22/2019 |
Supply, delivery, and Installation of Two(2) 22kV Ring Main Unit at Ruacana Power Station |
- Protecton Engineering Namibia
|
Download
|
W/ONB/NPWR-24/2020 |
Construction of Male and Female Accommodation Facilities at Ruacana Eha Lodge |
- Infinity Engineering cc & Project Consultants
|
Download
|
W/ONB/NPWR-26/2020 |
Design, Supply, Delivery, Installation, Splicing, Testing and Commissioning of Optic Fibre networks between Von Bach Booster 2 WAN NamPower Sub-station and Van Eck Power Sub-station |
- Fiber Communication Namibia (Pty) Ltd
|
Download
|
W/ONB/NPWR-25/2020 |
Design, Supply, Delivery, Installation, Splicing, Testing and Commissioning of Optic Fibre networks between Swakopmund to Tamariskia NamPower Sub-station |
- Fiber Communication Namibia (Pty) Ltd
|
Download
|
NCS/RB/NPWR-01/2019 |
Three (3) Year Internet Services |
- Paratus
- Telecom Namibia
|
Download
|
NCS/ONB/NPWR-03/2019 |
Provision of Local Courier and Related Services |
- Namibia Post Limited
|
Download
|
W/OIB/NPWR-01/2019 |
Supply, Installation and Commissioning of Wind Resource Measurement Stations with Lidar Systems |
- Joint Venture Measurewind & Arch
|
Download
|
SC/RP/NPWR-20/2019 |
The Provision of Technical Advisory and Project Management Services for the Luderitz Wind Power Project |
- OST Energy Africa (Pty) Ltd. and GS Fainsinger and Associates
|
Download
|
G/ONB/NPWR-21/2019 |
Supply and Delivery of Upgrade Communications Terminal Equipment |
- Protecton Engineering Namibia CC
|
Download
|
W/ONB/NPWR-20/2020 |
Construction of Medium Voltage and Low Voltage Networks at Shaama & Hanghome in Ohangwena Region |
- NBT Quality Services CC
|
Download
|