    The 360m long Access Gallery meets the machine Hall and the Transformer Hall at their eastern ends. The excavation of the modified horseshoe shape gallery was performed by perimeter drilling to achieve a regular rock surface, suited to final shotcrete. Mesh support and mechanically anchored rockbolts, 3.5m long with 100KN capacity, were used on fractural material. A total  excavation of 26 500m³ was required, including a lateral channel for the pipes and cables and the 18m extensions between the Machine caverns and Transformer Hall.

    Back Top Home

        
     Bursaries | Tenders | Careers | Downloads | Annual Reports | Watts On! | Site Map| FAQ
    Copyright © 2005 - 2009, NamPower